I. Approval of Public Agenda
II. Minutes of the meeting held on February 12, 2015
pwi0212m15.doc
III. Tabled Reports
IV. Administration Reports
1. PWI15-3 - Edward Street Sewer and Drainage Update
EdwardStreetUpdaterpt.doc
2. PWI15-4 - Amendments to The Regina Traffic Bylaw, 1997 No. 9900
AmendmenttotheTrafficBylawrpt.doc
AppendixA.pdf
3. PWI15-5 - Wastewater Trunk Relief Initiative – Issue and Award RFP
WastewaterTrunkReliefInitiativerpt.doc
4. PWI15-6 - Wastewaster Master Plan - Issue and Award RFP
WastewaterMasterPlanrpt.doc
5. PWI15-7 - Water Master Plan - Award RFP
WaterMasterPlan-AwardRFPrpt.doc
6. PWI15-8 - Increase in Engineering Services for the Design and Construction of Master Plan Drainage Area 2B (Albert Park)
MasterPlanDrainageArea2Brpt.doc
V. Informational Reports
1. PWI15-9 - Victoria Avenue East Between Prince of Wales Drive and Coleman Crescent – Bridge Replacements and Roadway Widening and Improvements
VictoriaAvenueEastrpt.docx
AppendixA.doc
AppendixB.doc
AppendixC.doc
AppendixD.pdf
VI. Other Reports
VII. Adjournment